Sign in
Enter MFA code
Dashboard
Multi-factor authentication
Scan with your authenticator app, then enter a code to enable.
New change request
Categories (admin)
| # | Name | Created | Actions |
|---|
Projects (admin)
| # | Name | Created | Actions |
|---|
TATs
Project members
| User | Global role | On project as | Since | Actions |
|---|
Users (admin)
| # | Phone | Role | MFA | Emerg. approver | Created | Actions |
|---|
Change requests
| # | Title | Project | Priority | Risk | Status | Created | Due | Closed | Requester | Actions |
|---|
Timeline
| When | Who | Action | Comment / details | Actions |
|---|
Help & documentation
What this app does
iKonTel Trakker tracks technical changes from request through review, approval, implementation, testing, and closure. Every transition is logged to a tamper-resistant audit trail and notifies the people who need to know.
Dashboard
The Dashboard tab is the default landing view. Tiles show:
- Open CRs — total currently in flight (status not in closed / cancelled / rejected).
- Critical (open) — how many open CRs have priority = critical. Tile turns red when > 0.
- Near TAT — open CRs whose due-by falls inside the project’s configured alert window.
- Overdue — open CRs past their due-by.
- No TAT configured — open CRs whose project doesn’t have a TAT for that priority. Should normally be 0.
- Total CRs and Closed / done — lifetime counts.
Below the tiles, breakdowns by status and by priority. Click Refresh to re-fetch.
The CR lifecycle
draft → submitted → approved/rejected → implemented → verified → closed
│
└─ test_failed (audit only,
stays implemented)
any non-terminal status → cancelled
Terminal states: rejected, closed, cancelled. A CR is fully done only after a reviewer marks it closed.
A comment is required at every transition.
Roles
You have two layers of role:
- Global role (set on your account): requester, approver, reviewer, implementer, tester, auditor, admin.
- Project membership (set per project by admin): implementer, tester, account manager. Project-scoped roles only act on CRs of projects you are assigned to.
| Role | What they do |
|---|---|
| requester | Creates and submits CRs; can cancel their own before implementation. |
| approver | Approves or rejects submitted CRs (global, not project-scoped). |
| reviewer | Posts review comments on submitted or approved CRs; closes a CR after verification. |
| implementer | Marks an approved CR as implemented. Must also be a project member of the CR’s project. |
| tester | Marks an implemented CR as verified, or records a test failure. Must be a project member. |
| account manager (project) | Notified on submit and verify for their projects. Read-only in workflow terms. |
| auditor | Read-only across the whole system; can view the global audit log. |
| admin | Universal override. Manages users, projects, categories, project members, TATs. Can edit timeline entries (these edits are not themselves audited). |
Fields on a CR
- Project — required. CRs are scoped to a project. Implementers, testers, and account managers act only on projects they are assigned to.
- Category — optional. A loose grouping (e.g. infrastructure, application). Admin manages the list.
- Risk — how dangerous the change is if it fails (low/medium/high).
- Priority — how urgent the change is (low/medium/high/critical). Risk and priority are independent.
- Emergency — tick if it must skip the regular CAB. Only users marked emergency approver can approve emergency CRs.
- Scheduled for — when you intend to do the work (informational).
TAT and due dates
Each project defines a TAT (turn-around time, in hours) per priority.
A CR’s due-by is computed as
creation time + TAT for that priority. The clock stops once
the CR is closed, rejected, or cancelled.
Open CRs past their due-by are flagged with an OVERDUE badge.
Each project also has a near-TAT alert window (default 24 hours). A CR whose due-by falls inside this window appears in the dashboard’s Near TAT tile. Admin sets it from Projects → TATs.
Comments & attachments
Every transition (submit / approve / reject / implement / verify / test-fail / close / cancel / review) requires a comment. The action button opens a modal where you can type the comment and optionally attach files.
Attachments accept up to 5 files, 10 MB each. Allowed types: PNG, JPEG, GIF, WebP, PDF, plain text, ZIP. Anything else is rejected.
Attachments appear inline in the CR’s timeline — image files render as thumbnails; other file types show as filename chips. Click to open or download. Anyone with read access to the CR can download attachments.
Common how-to’s
- File a CR: Changes → New change request. Pick project + priority + risk, write title and description, optionally tick Emergency, click Create draft. Then click Submit on the row (you’ll be prompted for a comment and can attach files).
- Attach a screenshot: any action button opens a comment modal with a file picker. Up to 5 files / 10 MB each.
- See history of a CR: click Timeline on the row. Every audit entry plus its attachments, in order.
- Approve / reject: only available to approvers, on submitted CRs. A comment is required.
- Implement / verify: the action button only appears if you are a project member with the right role on that project.
- Close: reviewer or admin clicks Close on a verified CR with a closure comment.
- Cancel: requester or admin, on any non-terminal CR.
- MFA: Settings → MFA. Scan the QR with Google Authenticator / Authy and enter a code.
Admin tasks
- Create users — Users panel. Public registration is disabled.
- Manage projects — Projects panel. Add/rename/delete (delete is refused if the project has CRs).
- Assign project members — Projects → Members. Assign implementers, testers, and account managers per project.
- Set TATs — Projects → TATs. Hours per priority per project, plus the per-project near-TAT alert window.
- Manage categories — Categories panel.
- Audit log — global view across all CRs and admin actions.
- Edit a timeline entry — Timeline → Edit on any row. Edits are not themselves audited (privileged correction path).
- Override a CR’s due date or closed date — Edit dates button on a CR row. For due: blank or “null” reverts to the project-TAT-derived value; for closed: blank or “null” clears. Not audited.
Glossary
- CR — change request.
- CAB — change advisory board (your global approvers).
- TAT — turn-around time. Maximum hours from creation to closure (per priority, per project).
- Near-TAT window — the lookahead period (per project) inside which an open CR’s due-by counts as “near” on the dashboard.
- Audit log — append-only record of every transition; anyone with auditor or admin role can read it; only admin can edit specific entries.
- Attachment — a file (image, PDF, etc.) bound to a specific audit entry. Up to 5 per comment, 10 MB each.